Skip to content
SHELL CONSTRUCTION · CALCULATION

External thermal insulation (ETICS).

Enter the facade area, insulation thickness and openings. We will calculate insulation boards, adhesive, anchors, mesh, render and profiles – with a section of the build-up.
✓ Bill of quantities✓ Element diagram✓ We quote the price✓ PDF · CSV · link
1Facade and openings
2Insulation
This material is not in the e-shop yet – we will price the list for you. You can edit quantities and item notes in the list, then send it as an inquiry, download it as PDF or share it via a link.
Diagram and summary
Insulation—
Adhesive—
Anchors—
Items on request—
Your materials
Total incl. VATapproximate, excl. delivery—
How we calculate
  • Insulation = area + 5 %; bonding adhesive approx. 4 kg/m² for EPS and 4.5 kg/m² for mineral wool, base coat with mesh 4.5 kg/m² for EPS and 5.5 kg/m² for mineral wool; mesh = area + 10 %; diagonal mesh strips 4 pcs per opening.
  • Anchors approx. 6 pcs/m² (8 pcs/m² for mineral wool), length = insulation thickness + 60 mm; primer 0.25 kg/m², render 2.5 kg/m² (grain 1.5 mm).
  • Plinth insulation XPS = perimeter × plinth height + 5 % (deducted from the main insulation); base profile = perimeter + 3 %, anchors every 30 cm; corner beads with mesh = reveals and house corners; window connection profile (APU) = reveals and heads + 5 %.
  • Consumption is indicative, based on data sheets of common systems; the number and type of anchors are set by the design according to STN 73 2902 (building height, wind, substrate).
Total incl. VAT—