Skip to content
SHELL CONSTRUCTION · CALCULATION

Floor screed.

Enter the room area, screed thickness and the insulation below. We calculate the screed, insulation, edge strip and foil – with a floor build-up section.
✓ Bill of quantities✓ Element diagram✓ We quote the price✓ PDF · CSV · link
1Dimensions and thickness
2Screed type and build-up
This material is not in the e-shop yet – we will price the list for you. You can edit quantities and item notes in the list, then send it as an inquiry, download it as PDF or share it via a link.
Diagram and summary
Volume—
Weight—
Edge strip—
Items on request—
Your materials
Total incl. VATapproximate, excl. delivery—
How we calculate
  • Volume = area × thickness + 5 %; dry mix weight per the manufacturer’s consumption (cement 20 kg/m² per 1 cm, anhydrite 18–19 kg/m² per 1 cm, we use 18.5).
  • Edge strip = room perimeter + 5 % (5 mm thick, at least 10 mm with underfloor heating); PE separation foil = area + 10 %; EPS insulation = area + 3 %. We do not include reinforcing mesh: the manufacturer does not recommend it unless the design requires it.
  • Floating screed: cement at least 45 mm, anhydrite at least 35 mm (load up to 2 kN/m²); with underfloor heating this applies above the pipes (with ~17 mm pipe about 62 / 52 mm in total). Bonded cement screed at least 35 mm. For higher loads the design sets the thickness.
  • Cement screed is divided by movement joints into fields up to 40 m² (side up to 8 m, aspect ratio up to 1 : 2) and at doorways; exact layout per the design and manufacturer.
Total incl. VAT—