Skip to content
SHELL CONSTRUCTION · CALCULATION

Plasterboard partition and ceiling.

Enter the dimensions of the wall or room. We will calculate boards, profiles, screws, filler, tape and door reinforcement – with a profile layout.
✓ Bill of quantities✓ Element diagram✓ We quote the price✓ PDF · CSV · link
1What are you building
2Dimensions and profile
This material is not in the e-shop yet – we will price the list for you. You can edit quantities and item notes in the list, then send it as an inquiry, download it as PDF or share it via a link.
Also from the e-shop
Diagram and summary
Area—
Boards—
Profiles—
Items on request—
Your materials
Total incl. VATapproximate, excl. delivery—
How we calculate
  • Partition: boards 1250 mm wide over the full wall height (2000 – 3000 mm, no horizontal joints) – number = length × 2 sides × layers ÷ 1.25 m + 10 % for cutting (the offcut from the height is not used); a wall higher than 3 m is joined – cladding area + 10 % ÷ board area. Ceiling: boards 1250 × 2000 mm, area + 10 % ÷ 2.5 m².
  • Partition: CW every 62.5 cm, length according to height, UW 2 × length, mineral insulation, sealing tape and anchors every 80 cm; at doors 2 UA profiles the height of the wall + UW above the door and 4 UA angles; ceiling: single-level grid – CD every 50 cm (2 lm/m²), hangers every 90 cm (~2 pcs/m²), UD around the perimeter.
  • Consumption per the Rigips table: screws 12 pcs/m² of board on a partition (24 pcs/m² of wall), 17 pcs/m² on a ceiling; filler 0.3 kg/m² of board (inner layer 0.15 kg/m², final skim ~0.1 kg/m² extra); joint tape 0.8 lm/m² of board on a partition, 1.1 lm/m² on a ceiling, outer layer only. Door area is not deducted from boards (offcuts cannot be used whole).
Total incl. VAT—